Case Studies
Below are a variety of case studies for our business
Central Power Case Studies
Highly recommended!
“I am pleased to confirm that Central Power Services diligence and attention to detail in sizing the generator equipment proved to be the crucial factor in gaining our confidence to place theRead full case study>>>
Service is outstanding
“Even though this hospital was on contract with another service provider who failed to respond to my out of hours emergency; CPS stepped in and recovered the situation. Their level of serviceRead full case study>>>
Honest, professional and competent
“Our last project demanded a very short lead time combined with a technically bespoke specification. I found Central Power Services to be honest, professional and competent in all aspects ofRead full case study>>>
No hesitation in recommending CPS
“As soon as I saw the standard of delivered equipment and the professional manner in which the installation was being performed, I was confident that I had chosen the right Company for the job.Read full case study>>>
Every confidence in recommending them
“Thanks to CPS engineer’s recommendation for a thermal image survey on the changeover panel, we uncovered a problem, which if undiscovered, could have resulted in a major fire hazardRead full case study>>>
Our first choice
“Christmas day at 12 noon, and the hotel mains switchboard was overloaded to the level where it was a fire hazard. The hotel power had to be switched off – completely. We called CPS for aRead full case study>>>






