Choosing the right generator isn't simply about selecting the biggest unit available.

A generator that's too small may overload and struggle to power your equipment, while one that's significantly oversized can be less efficient and increase operating costs.

Whether you're planning a construction project, supporting a factory shutdown or arranging emergency standby power, selecting the correct generator is essential for reliable, safe and cost-effective operation.

Why generator sizing matters

Every project has different power requirements.

A temporary office may only require a small generator, while a manufacturing facility or large commercial building could need hundreds of kVA to keep essential operations running.

Selecting the correct size helps ensure:

  • Reliable power delivery
  • Safe operation
  • Efficient fuel consumption
  • Reduced risk of overloading
  • Capacity for equipment starting currents
  • Flexibility if your power requirements change

The aim is to provide enough power without paying for unnecessary capacity.

How to Choose the Right Size Generator for Your Project

Selecting the correct generator is essential for reliable, safe and cost-effective operation.

Start by understanding what needs to be powered

Before choosing a generator, make a list of every item that will require electricity.

This may include:

  • Lighting
  • Heating or cooling equipment
  • Office facilities
  • Welfare cabins
  • Manufacturing machinery
  • IT equipment
  • Catering equipment
  • Security systems

Knowing exactly what needs to remain operational is the first step towards selecting the right temporary power solution.

Don't forget starting loads

Some equipment requires considerably more power to start than it does during normal operation.

Electric motors, pumps, compressors and refrigeration equipment often have high starting currents that must be considered when sizing a generator.

Ignoring these additional demands can result in nuisance trips, voltage drops or equipment failing to start altogether.

An experienced generator hire provider will take these factors into account when recommending the appropriate generator.

Think about future requirements

It's common for projects to evolve.

Construction sites expand, additional equipment is installed and temporary facilities increase as work progresses.

Choosing a generator that provides some flexibility for future demand can avoid the need to replace equipment part-way through the project.

However, this should be balanced against selecting a generator that is significantly larger than necessary.

Consider the operating environment

Generator selection isn't only about electrical load.

Other factors may influence the most appropriate solution, including:

  • Available space
  • Site access
  • Noise restrictions
  • Running hours
  • Fuel storage requirements
  • Environmental considerations
  • Project duration

Discussing these factors early helps ensure the generator is suitable for both the site and the application.

Why professional advice makes a difference

Generator sizing involves far more than adding together the power ratings shown on equipment labels.

Experienced engineers consider factors such as:

  • Total connected load
  • Equipment starting characteristics
  • Load diversity
  • Future expansion
  • Site conditions
  • Distribution requirements
  • Fuel management
  • Operational resilience

This helps ensure the generator selected is appropriate for your project while avoiding unnecessary costs or operational risks.

What sizes are available?

Generator hire fleets are designed to support a wide variety of applications.

At Central Power Services, our fleet ranges from 20kVA to 1250kVA, allowing us to support everything from temporary offices and construction sites to manufacturing facilities, healthcare environments and critical infrastructure.

Where larger power requirements exist, multiple generators can also be configured to meet the demands of more complex projects.

Common mistakes to avoid

Businesses often make the same mistakes when arranging temporary power, including:

  • Choosing a generator based on guesswork
  • Forgetting about starting currents
  • Not allowing for future expansion
  • Underestimating fuel requirements
  • Overlooking distribution equipment and cabling
  • Selecting equipment based on price alone rather than suitability

Working with an experienced hire provider helps avoid these issues and ensures your temporary power solution is fit for purpose from day one.

Getting it right the first time

The right generator keeps your project running smoothly, supports productivity and reduces the risk of costly interruptions.

Whether you're planning a scheduled shutdown, supporting a construction project or responding to an unexpected power outage, selecting the correct generator is one of the most important decisions you'll make.

At Central Power Services, our experienced engineers assess your individual requirements and recommend the most appropriate temporary power solution. With a fleet ranging from 20kVA to 1250kVA, together with fuel management, distribution equipment, accessories and 24/7 emergency response, we help businesses across the UK stay powered with confidence.

Return to top