The Brief:

When the Stockport & Manchester based Consultancy firm ECS Ltd were tasked to Design and Project Manage the Electrical Infrastructure Upgrade Works for Qiagen at Manchester Science Park, they chose CPS Ltd as the preferred supplier of the replacement Genset.  

The scheme of works included for de-commission and removal from site of the existing 400KVA Packaged Genset, as well as for the supply of a 200KVA Rental Genset to cover essential loads until the new 800KVA Packaged Genset had been fully commissioned and handed over.

The Conclusion

CPS Ltd co-ordinated works in-line with other contractors, ensuring an enhanced delivery of the project, thus allowing infrastructure upgrades to be fully operational to the Project Milestones.    

View all CPS Case Studies

Meet Gareth Shaw: Hire, Parts and Transport at CPS

Meet Gareth Shaw: Hire, Parts and Transport at CPS

29th April 2025

Gareth Shaw is one of the longest-serving team members at Central Power Services, having joined...

Read More

CPS BLOG

What’s the difference between a UPS and a generator?

What’s the difference between a UPS and a generator?

25th April 2025

While uninterruptible power supplies and generators both provide backup power during outages, they...

Read More

CPS BLOG

Head Office

Call 0845 437 9750

Email sales@central-power.co.uk

Parts Hotline

Call 0845 437 9750

Email parts@central-power.co.uk

Sales Enquiries

Call 01995 642 600

Contact enquiry form