Site Power Infrastructure & Genset upgrade works

Date: 12/09/17

Customer: QIAGEN

Client: QIAGEN

Scheme of Works: Site Power Infrastructure & Genset upgrade works

The Brief:

When the Stockport & Manchester based Consultancy firm ECS Ltd were tasked to Design and Project Manage the Electrical Infrastructure Upgrade Works for Qiagen at Manchester Science Park, they chose CPS Ltd as the preferred supplier of the replacement Genset.  

The scheme of works included for de-commission and removal from site of the existing 400KVA Packaged Genset, as well as for the supply of a 200KVA Rental Genset to cover essential loads until the new 800KVA Packaged Genset had been fully commissioned and handed over.

The Conclusion

CPS Ltd co-ordinated works in-line with other contractors, ensuring an enhanced delivery of the project, thus allowing infrastructure upgrades to be fully operational to the Project Milestones.    

View all CPS Case Studies

Lighting up the festive season: top power generation tips for Christmas market organisers

Lighting up the festive season: top power generation tips for Christmas market organisers

4th December 2024

At Central Power Services, we’ve been powering some of the UK’s leading Christmas markets for...

Read More

CPS BLOG

Don’t score an own goal with your back-up power systems

Don’t score an own goal with your back-up power systems

28th November 2024

The floodlights failure at Fratton Park serves as a reminder of the importance for football clubs...

Read More

CPS BLOG

Head Office

Call 0845 437 9750

Email sales@central-power.co.uk

Parts Hotline

Call 0845 437 9750

Email parts@central-power.co.uk

Sales Enquiries

Call 01995 642 600

Contact enquiry form